Year | Location | Project | Work type | Description | Company |
---|---|---|---|---|---|
2023 | Uruguay | E-FUEL | Connectivity Study | Connectivity study for an e-fuel plant and its associated renewable energy generation, in the Uruguayan electrical grid. Study carried out with 1200 MW of generation and 750 MW of consumption. | HIF Chile Holdings SpA |
2023 | Uruguay | VENCODESA BESS SGP & SYI | Power flow - Stability - Harmonics | BESS modeling for San Gregrorio de Polanco (10MVA) y Sarandí del Yí (8MVA) sites. Viability, power flow, short circuit, harmonics, stability and black start studies. Island and grid connected mode. | VENCODESA S.A. |
2022 | Uruguay | UPM 2 | Electromagnetics transients | Electromagnetics transients modeling of Biomass plant: transmission client (240 MW in loads) and biomass generator (426 MVA in generation). Passive grid, loads, generators and control system modeling. | Clerk |
2022 | Uruguay | SEG BESS SGP & SYI | Power flow | BESS modeling for San Gregrorio de Polanco (10MVA) y Sarandí del Yí (8MVA) sites. Viability studies. | SEG ingeniería |
2022 | Uruguay | AKUO BESS SGP & SYI | Power flow - Stability | BESS modeling for San Gregrorio de Polanco (10MVA) y Sarandí del Yí (8MVA) sites. Viability, power flow, short circuit, stability and black start studies. Island and grid connected mode. | AKUO Energy |
2022 | Uruguay | STILER BESS SGP & SYI | Power flow - Stability | BESS modeling for San Gregrorio de Polanco (10MVA) y Sarandí del Yí (8MVA) sites. Viability, power flow, short circuit, stability and black start studies. Island and grid connected mode. | STILER S.A. |
2022 | Uruguay | UPM 2 | PO-TRA-SL-0001/02 training | Training on PO-TRA-SL-0001/02 regulation for foreign and national engineers in charge of on-site building at UPM 2 (Transmission client and biomass generator) facilities. | ABB |
2022 | Uruguay | Albisu | Power flow - Stability | Modeling of photovoltaic farm, installed power 10 MW. Modeled for power flow, short circuit and stability studies. | Ventus SRL |
2022 | Uruguay | Tubacero | Power flow | Modeling of photovoltaic farm, installed power 0.3 MW. Modeled for power flow and short circuit studies. | Ventus SRL |
2022 | Uruguay | Pamer | Power flow | Modeling of photovoltaic farm, installed power 3.5 MW. Modeled for power flow and short circuit studies. | Ventus SRL |
2022 | Uruguay | Cristalpet | Power flow | Modeling of photovoltaic farm, installed power 1.3 MW. Modeled for power flow and short circuit studies. | Ventus SRL |
2022 | Uruguay | Giacote Menafra | Electromagnetics transients | Modeling of photovoltaic farm, installed power 20 MW. Modeled for electromagnetics transients studies. | Giacote SA |
2021-2022 | Uruguay | Punta del Tigre | Power flow - Stability | Photovoltaic farm, installed power 30MW. Power flow and stability model creation. | Sungrow |
2021 | Uruguay | Zonamerica: private town | Power flow | Grid and load modeling for private town, free commerce zone. Voltage studies. Installed power: 8MW. | Ingener |
2021 | Ethiopia | National transmission grid | Manual creation | Creation of a power losses guide manual | Mercados Aries International |
2020 | Uruguay | Statcom insertion studies | Power flow - Stability - Harmonics | Studies determination for the installation of a 180 MVA Statcom in a transmission Substation | UTE |
2020 | Ethiopia | National transmission grid | Course training | International training in power losses, study philosophy and results oriented methodology. | Mercados Aries International |
2020 | Ethiopia | National transmission grid | Power flow | Power losses study for the complete transmission grid. | Mercados Aries International |
2020 | Dominican Republic | Frequency stability - O.C. | Training course | Seminar dedicated to frequency stability in electrical grids with lack of inertia. Participants of the Coordinated Organization for the National Interconnected Electric System - Domincan Republic. | O.C. S.E.N.I. |
2020 | Argentina - Uruguay | CTM | Electromagnetics transients | Calculation of neutral reactors in expansion project of CTM (Mixed Technical Commission) Salto Grande - Uruguay. | UTE |
2019-2020 | Mexico | Sol de Sonora | Power flow - Power quality - Protections | Photovoltaic farm, installed power 10MW. Power flow, harmonics and protections studies. | Gransolar |
2019 | Uruguay | Salto Grande | Electromagnetics transients | Reclosing study in transmission substation Salto Grande - 500 kV. | UTE |
2019 | Uruguay | Anillo 500 kV | Electromagnetics transients | Study for the insertion of damping reactors in the context of grid transmission planning. | UTE |
2019 | Uruguay | Anillo 500 kV | Electromagnetics transients | Energization study for 2 transmission lines, taking into account lines transpositions. Comparison against stablished limits. | UTE |
2018-2020 | Panama | Ikakos 0, 1, 2 & 3 | Power flow - Stability - Management | Photovoltaic farm, installed power 40MW. Power flow and stability model creation. Power flow and stability studies. Contract management. | Grupo Cobra |
2018 | Uruguay | Anillo 500 kV | Electromagnetics transients | Modeling of electrical line parameters from physical topology, conductor type, tower type and geographical disposition. Reactive compensation study. | UTE |
2018 | Uruguay | Anillo 500 kV | Electromagnetics transients | Calculation of neutral reactors for grid transmission planning. In total, 800 kms in transmission lines to be fully compensated. | UTE |
2018 | Uruguay | Punta del Tigre | Electromagnetics transients | Energization study for connecting lines of Punta del Tigre substation - 500 kV. | UTE |
2018 | Mexico | Bluemex | Power flow - reactive compensation | Photovoltaic farm, installed power 90MW. Power flow and reactive compensation studies. | Gran Solar |
2018 | Mexico | Camargo | Power flow - reactive compensation | Photovoltaic farm, installed power 25 MW. Power flow and reactive compensation studies. | Ingeniea |
2018 | Australia | Lilyvale | Power flow - Electromagnetics transients | Photovoltaic farm, installed power 118MW. Power flow and insulation coordination studies. | Ingeniea |
2018 | Uruguay | Uruguayan grid modeling in ATP/Draw | Electromagnetics transients | The whole Uruguayan electrical transmission grid, modeled for electromagnetic transients studies. Almost 5000 MW installed in generation, 300 transmission lines, 250 transformers and their respective loads, capacitors and inductors bank, etc. | UTE |
2016 | Uruguay | Wind power plant Pampa | Electromagnetics transients | Ferroresonance study in the context of the insertion of a wind power plant. | UTE |
2016 | Uruguay - Brazil | Conversion station HVDC | Electromagnetics transients | Modeling of frequency conversion station HVDC - 50 Hz/60 Hz - 500 kV - 500 MVA - boundary between Uruguayan and Brazilian grid. | UTE |
2015 | Uruguay | Montes del Plata | Connectivity Study | Connectivity study, installed power 160MW. Impact analysis and grid planning in transmission grid. | UTE |
2015 | Uruguay | Ombues generator | Connectivity Study | Connectivity study, installed power 10MW. Impact analysis in Distribution and Transmission grid. | UTE |
2014 | Uruguay | Multiple studies | Connectivity Study | 26 connectivity studies. Loads and generators with authorized/installed power between 2.5MW and 20MW. Loads and generators to be installed on Distribution grid. Impact analysis in Distribution and Transmission grid. | UTE |
2015-2016 and 2020-2021 | Uruguay | Estrellada Melowind | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2015 and 2020-2021 | Uruguay | Alto Cielo | Power flow - Power quality - Stability - Electromagnetics transients | Photovoltaic farm, installed power 20MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017-2018 and 2020-2021 | Uruguay | Pampa | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 140MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017 and 2019-2020 | Uruguay | Astidey | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017 and 2019-2020 | Uruguay | Cadonal | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017 and 2019-2020 | Uruguay | Colonia Arias | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 70MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017 and 2019-2020 | Uruguay | R. del Este | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017 and 2019-2020 | Uruguay | R. del Sur | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2015-2016 and 2019-2020 | Uruguay | Valentines | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 70MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2014 and 2019 | Uruguay | Agua leguas 1 | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2014 and 2019 | Uruguay | Agua leguas 2 | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017-2018 | Uruguay | Jolipark | Power flow - Power quality - Stability | Wind farm, installed power 20MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2017-2018 | Uruguay | Ladaner | Power flow - Power quality - Stability - Electromagnetics transients | Wind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval. | UTE |
2017-2018 | Uruguay | Palomas | Power flow - Power quality - Stability | Wind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2017 | Uruguay | Juan Pablo Terra | Power flow - Power quality - Stability | Wind farm, installed power 140MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2017 | Uruguay | Colidim (El naranjal) | Power flow - Power quality - Stability | Photovoltaic farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2016-2017 | Uruguay | Montes del plata | Power flow - Power quality | Biomass generator, installed power 160MW. Power flow model approval. Power quality study and field test approval. | UTE |
2015-2016 | Uruguay | Fingano | Power flow - Power quality - Stability | Wind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2015-2016 | Uruguay | Polesine II | Power flow - Power quality - Stability | Wind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2015-2016 | Uruguay | Vengano | Power flow - Power quality - Stability | Wind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2015-2016 | Uruguay | Vientos de Pastorale | Power flow - Power quality - Stability | Wind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2015-2016 | Uruguay | Cobra (Kiyu) | Power flow - Power quality - Stability | Wind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2014-2015 | Uruguay | Gemsa Polesine I | Power flow - Power quality - Stability | Wind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |
2014-2015 | Uruguay | La Jacinta | Power flow - Power quality - Stability | Photovoltaic farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval. | UTE |