YearLocationProjectWork typeDescriptionCompany
2022UruguayUPM 2PO-TRA-SL-0001/02 trainingTraining on PO-TRA-SL-0001/02 regulation for foreign and national engineers in charge of on-site building at UPM 2 (Transmission client and biomass generator) facilities.ABB
2022UruguayAlbisuPower flow - StabilityModeling of photovoltaic farm, installed power 10 MW. Modeled for power flow, short circuit and stability studies.Ventus SRL
2022UruguayTubaceroPower flowModeling of photovoltaic farm, installed power 0.3 MW. Modeled for power flow and short circuit studies.Ventus SRL
2022UruguayPamerPower flowModeling of photovoltaic farm, installed power 3.5 MW. Modeled for power flow and short circuit studies.Ventus SRL
2022UruguayCristalpetPower flowModeling of photovoltaic farm, installed power 1.3 MW. Modeled for power flow and short circuit studies.Ventus SRL
2022UruguayGiacote MenafraElectromagnetics transientsModeling of photovoltaic farm, installed power 20 MW. Modeled for electromagnetics transients studies.Giacote SA
2021-2022UruguayPunta del TigrePower flow - StabilityPhotovoltaic farm, installed power 30MW. Power flow and stability model creation.Sungrow
2021UruguayZonamerica: private townPower flowGrid and load modeling for private town, free commerce zone. Voltage studies. Installed power: 8MW.Ingener
2021EthiopiaNational transmission gridManual creationCreation of a power losses guide manualMercados Aries International
2020UruguayStatcom insertion studiesPower flow - Stability - HarmonicsStudies determination for the installation of a 180 MVA Statcom in a transmission SubstationUTE
2020EthiopiaNational transmission gridCourse trainingInternational training in power losses, study philosophy and results oriented methodology.Mercados Aries International
2020EthiopiaNational transmission gridPower flowPower losses study for the complete transmission grid.Mercados Aries International
2020Dominican RepublicFrequency stability - O.C.Course trainingSeminar dedicated to frequency stability in electrical grids with lack of inertia. Participants of the Coordinated Organization for the National Interconnected Electric System - Domincan Republic.O.C. S.E.N.I.
2020Argentina - UruguayCTMElectromagnetics transientsCalculation of neutral reactors in expansion project of CTM (Mixed Technical Commission) Salto Grande - Uruguay.UTE
2019-2020MexicoSol de SonoraPower flow - Power quality - ProtectionsPhotovoltaic farm, installed power 10MW. Power flow, harmonics and protections studies.Gransolar
2019UruguaySalto GrandeElectromagnetics transientsReclosing study in transmission substation Salto Grande - 500 kV.UTE
2019UruguayAnillo 500 kVElectromagnetics transientsStudy for the insertion of a shock reactor in the context of grid transmission planning.UTE
2019UruguayAnillo 500 kVElectromagnetics transientsEnergization study for 2 transmission lines, taking into account lines transpositions. Comparison against stablished limits.UTE
2018-2020PanamaIkakos 0, 1, 2 & 3Power flow - Stability - ManagementPhotovoltaic farm, installed power 40MW. Power flow and stability model creation. Power flow and stability studies. Contract management.Grupo Cobra
2018UruguayAnillo 500 kVElectromagnetics transientsModeling of electrical line parameters from physical topology, conductor type, tower type and geographical disposition. Reactive compensation study.UTE
2018UruguayAnillo 500 kVElectromagnetics transientsCalculation of neutral reactors for grid transmission planning. In total, 800 kms in transmission lines to be fully compensated.UTE
2018UruguayPunta del TigreElectromagnetics transientsEnergization study for belonging lines of Punta del Tigre substation - 500 kV.UTE
2018MexicoBluemexPower flow - reactive compensationPhotovoltaic farm, installed power 90MW. Power flow and reactive compensation studies.Gran Solar
2018MexicoCamargoPower flow - reactive compensationPhotovoltaic farm, installed power 25 MW. Power flow and reactive compensation studies.Ingeniea
2018AustraliaLilyvalePower flow - Electromagnetics transientsPhotovoltaic farm, installed power 118MW. Power flow and insulation coordination studies.Ingeniea
2018UruguayUruguayan grid modeling in ATP/DrawElectromagnetics transientsThe whole Uruguayan electrical transmission grid, modeled for electromagnetics transients studies. Almost 5000 MW installed in
generation, 300 transmission lines, 250 transformers and their respective loads, capacitors and inductors bank, etc.
UTE
2016UruguayWind power plant PampaElectromagnetics transientsFerroresonance study in the context of the insertion of a wind power plant.UTE
2016Uruguay - BrazilConversion station HVDCElectromagnetics transientsModeling of frequency conversion station HVDC - 50 Hz/60 Hz - 500 kW - boundary between Uruguayan and Brazilian grid.UTE
2015UruguayMontes del PlataConnectivity StudyConnectivity study, installed power 160MW. Impact analysis and grid planning in transmissiongrid.UTE
2015UruguayOmbues generatorConnectivity StudyConnectivity study, installed power 10MW. Impact analysis in country Distribution and Transmission grid.UTE
2014UruguayMultiple studiesConnectivity Study26 connectivity studies. Loads and generators with authorized/installed power between 2.5MW and 20MW. Loads and generators to be installed on Distribution grid. Impact analysis in country Distribution and Transmission grid.UTE
2015-2016 and 2020-2021UruguayEstrellada MelowindPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2015 and 2020-2021UruguayAlto CieloPower flow - Power quality - Stability - Electromagnetics transientsPhotovoltaic farm, installed power 20MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017-2018 and 2020-2021UruguayPampaPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 140MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017 and 2019-2020UruguayAstideyPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017 and 2019-2020UruguayCadonalPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017 and 2019-2020UruguayColonia AriasPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 70MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017 and 2019-2020UruguayR. del EstePower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017 and 2019-2020UruguayR. del SurPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2015-2016 and 2019-2020UruguayValentinesPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 70MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2014 and 2019UruguayAgua leguas 1Power flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2014 and 2019UruguayAgua leguas 2Power flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017-2018UruguayJoliparkPower flow - Power quality - StabilityWind farm, installed power 20MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2017-2018UruguayLadanerPower flow - Power quality - Stability - Electromagnetics transientsWind farm, installed power 50MW. Power flow, stability and electromagnetics transients model approval. Power quality study and field test approval.UTE
2017-2018UruguayPalomasPower flow - Power quality - StabilityWind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2017UruguayJuan Pablo TerraPower flow - Power quality - StabilityWind farm, installed power 140MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2017UruguayColidim (El naranjal)Power flow - Power quality - StabilityPhotovoltaic farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2016-2017UruguayMontes del plataPower flow - Power qualityBiomass generator, installed power 160MW. Power flow model approval. Power quality study and field test approval.UTE
2015-2016UruguayFinganoPower flow - Power quality - StabilityWind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2015-2016UruguayPolesine IIPower flow - Power quality - StabilityWind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2015-2016UruguayVenganoPower flow - Power quality - StabilityWind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2015-2016UruguayVientos de PastoralePower flow - Power quality - StabilityWind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2015-2016UruguayCobra (Kiyu)Power flow - Power quality - StabilityWind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2014-2015UruguayGemsa Polesine IPower flow - Power quality - StabilityWind farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE
2014-2015UruguayLa JacintaPower flow - Power quality - StabilityPhotovoltaic farm, installed power 50MW. Power flow, stability model approval. Power quality study and field test approval.UTE