Year | Location | Project | Work type | Description | Company |
---|---|---|---|---|---|
2023 | Inglaterra | 350 MW PV plant | Connectivity Study | Connectivity study for a 350 MW photovoltaic plant, in the Uruguayan electrical grid. Location selection and definition of installed power. | Island Green Power |